Engineers of record
Install to your design. Hand you the record.
We coordinate pile layout, install to your stop criteria, and return torque logs with an as-built plan. Sample sheets below are illustrative — not a certified system or a calculation.
Field documentation
Torque logsRecorded while each pile rotates — for your correlation, not a substitute for design.
ASTM A123Hot-dip galvanizing planned for coastal exposure unless you specify otherwise.
As-builtLayout, depths, deviations, and photos packaged for closeout.

What the design still settles
Axial, uplift, and lateral demand. Soil and groundwater. Scour. Corrosion protection. Plumb vs battered. Termination into concrete, steel, or wood. We install — you remain engineer of record.
Ask for the current product evaluation report for the shaft specified on the job. Report numbers are not invented here. Email [email protected] to coordinate.