Engineers of record

Install to your design. Hand you the record.

We coordinate pile layout, install to your stop criteria, and return torque logs with an as-built plan. Sample sheets below are illustrative — not a certified system or a calculation.

Field documentation

Torque logsRecorded while each pile rotates — for your correlation, not a substitute for design.
ASTM A123Hot-dip galvanizing planned for coastal exposure unless you specify otherwise.
As-builtLayout, depths, deviations, and photos packaged for closeout.
Hydraulic drive head advancing a galvanized helical pile on a coastal pad.
Rotation install — torque written down as the shaft advances.

What the design still settles

Axial, uplift, and lateral demand. Soil and groundwater. Scour. Corrosion protection. Plumb vs battered. Termination into concrete, steel, or wood. We install — you remain engineer of record.

Ask for the current product evaluation report for the shaft specified on the job. Report numbers are not invented here. Email [email protected] to coordinate.

Coordinate a layout